Why this matters for General Contracting businesses
The General Contracting-specific angle
How Cornerstone GC would set this up
Consider Cornerstone GC, a general contracting operation serving Denver, CO. A typical bathroom remodel job at the 1428 Cherry Lane address triggers the following automation:
- Technician taps "Job Complete" in the field — bathroom remodel marked done.
- 4 hours later, Robert receives an SMS asking for a Google review.
- Review request mentions punch-list completion specifically — feeds Local Pack keyword relevance.
- If Robert leaves a 4+ star review, a 25-card postcard campaign fires to neighbors around 1428 Cherry Lane.
- Robert also gets a referral link — both they and a referred neighbor get a discount on the next job.
- Compliance: 9 AM-8 PM quiet hours respected, opt-out logged, license # auto-included on postcards where required.
Read the full pillar guide
This page covers the general contracting-specific angle. For the complete mechanics — full timing tables, all the templates, the FTC and TCPA detail, and the response-framework playbooks — read the foundational pillar:
Pillar Guide
Multi-Location Operations Playbook
The comprehensive playbook covering every angle of this topic for local service businesses.
Read the full pillar guide